Free tool — no account

What should this bid include?

Pick the trades in your job and see the line items a complete bid covers — plus the ones that quietly go unmentioned.

The “commonly goes unmentioned” column is the useful half. Anyone can tell you a plumbing bid should include plumbing; the money is in knowing it probably says nothing about who moves the gas line.

Which trades are in your job?

Plumbing

A complete bid prices

  • Rough-in for every fixture in the scope
  • Setting fixtures once finishes are in
  • Water heater replacement if the scope calls for it
  • Inspection coordination for the rough and the final

Commonly goes unmentioned

  • Who supplies the fixtures — the bid may only cover installing yours
  • Gas line moves for a range or a dryer
  • Replacing supply lines back to the main, versus only what is visible
  • Shutoff valves and escutcheons at each fixture

Electrical

A complete bid prices

  • Devices, switches, and cover plates in the scope area
  • Circuits for anything new — island, microwave, bath heat
  • Fixture installation where the scope includes lighting

Commonly goes unmentioned

  • Panel capacity: whether an upgrade is included or assumed unnecessary
  • Bringing existing untouched circuits up to current code once a permit opens
  • Who supplies the light fixtures
  • Smoke and CO detectors, which most inspectors will require throughout

Already holding the bids?

This list tells you what to look for. RehabRocket tells you which of your bids is missing which line — and writes the question to send back to that contractor.